Published by Eutopix Labs P.S.A., the developer of GanttPeek. Microsoft Project is a trademark of Microsoft; GanttPeek is independent.
The short route, step by step
- Open the .mpp in GanttPeek: Command-O on Mac, or the document picker on iPhone and iPad.
- Check the tasks, dates and hierarchy look right, and read the data note if the file uses fields the app does not extract.
- On Mac choose File, then Export Tasks as CSV. On iPhone and iPad use the More menu and share the CSV.
- Open the CSV in Excel (or double-click it), or import it with Data, then From Text/CSV, if you want to control how dates are read.
What the spreadsheet contains
The CSV is one row per task. The columns include ID, WBS, Name, Start, Finish, Duration, Percent Complete, Critical, Milestone and Cost. If a file does not carry a field, such as progress, critical-path flags or costs, that column is left blank rather than filled with a guess.
What does not come across
- The Gantt bars. A CSV is a table. If you need the chart, export the Gantt as a PDF or PNG instead.
- Formulas, formatting and an .xlsx workbook. The file is plain CSV, which Excel opens as a normal sheet.
- Anything the parser does not extract from MPP files: constraints, notes, calendar exceptions, custom fields and resource capacity.
- Live links. The spreadsheet is a snapshot of the schedule on the day you exported it.
Other ways, and their catch
| Route | Catch |
|---|---|
| Save as Excel from Microsoft Project | Needs a Project licence and Windows. |
| Free online MPP to Excel converter | The schedule is uploaded, and a project plan usually names staff, durations and client commitments. |
| Ask the sender for an Excel export | Quick if they reply, but you cannot check a later revision yourself. |
| Export CSV from GanttPeek | Local and offline; CSV only, and limited to the fields extracted. |
Tidy the sheet in five minutes
- Set the Start and Finish columns to a date format that matches your region.
- Use the WBS column to sort back to schedule order after filtering.
- Filter Milestone to true for a milestone list you can paste into a report.
- Filter Percent Complete below 100 for an open-items list, where progress was available.
- Keep the exported date in the file name, since the CSV will not update itself.
Privacy and the free file
GanttPeek has no account, no analytics SDK and no cloud parser, so the file you pick is read only on your device. One real schedule file is included at no charge with every viewing and export tool; reopening the same file does not use another slot, but a changed revision counts as a new file.
Three common spreadsheet jobs
A milestone list for a status report: export the CSV, filter Milestone to true, sort by Finish and paste the result into your report. It takes a couple of minutes and the dates match what you saw in the app.
A hand-over check for a new project manager: export the CSV, keep ID, WBS, Name, Start and Finish, and add your own columns for owner and risk. Because the CSV is a snapshot, save it with the revision date in the file name.
A comparison of two revisions: export both versions and line them up by ID in a spreadsheet. If you only want to see what changed, the app’s own Compare revisions view, lists changed, added and removed tasks with before and after dates where they were extracted, which is quicker than a manual diff.
If dates look wrong in Excel
CSV files carry text, and Excel decides how to read it from your regional settings. If a date turns into a number or swaps day and month, close the file and import it with Data, then From Text/CSV, and set the column type to Date with the right locale. Do not edit the values by hand; fix the import setting instead. Durations are exported as the readable text you see in the app, so they are labels, not numbers you can add up without converting them first.
When a PDF is the better choice
If the reader only needs to see the plan, a spreadsheet is more work than it is worth. A PDF keeps the layout, opens on any phone and cannot be edited by accident. Use the CSV when someone needs to sort, filter, add columns or paste rows into another document, and use the PDF when they need to read. Many people send both.
Questions
Can I convert MPP to Excel for free?
Yes for one real schedule file in GanttPeek, which includes CSV export.
Does the export keep the task hierarchy?
The CSV includes a WBS column and the task order, so you can rebuild the outline. Indentation as such is not part of a CSV.
Is the MPP modified by the export?
No. The export creates a new file and the source MPP is never written to.
Can I get the Gantt chart into Excel?
Not as an editable chart. Export the Gantt as a PDF or PNG, or print it, and attach that beside the spreadsheet.